Skip to main content

AIQ Production System Requirements

AIQ Production System Requirements

Use this page when planning a production or production-like AIQ environment. Replace older “Appvance IQ” wording with current AIQ terminology and validate sizing against the expected workload.

Planning checklist

  • Confirm expected users, concurrent executions, test types, data volume, retention, and reporting needs.
  • Size Controller, database, Test Nodes, storage, browser/device capacity, and network throughput for the workload.
  • Plan backup, restore, monitoring, log retention, certificate renewal, and patching processes.
  • Validate database, repository, SSO, SMTP, CI/CD, and third-party integration requirements.
  • Document firewall, proxy, DNS, load balancer, and service-account requirements.

Validation workflow

  1. Run a production-readiness review before go-live.
  2. Execute smoke tests for login, execution, reports, repositories, integrations, and node connectivity.
  3. Monitor resource usage during the first representative run.
  4. Record scaling assumptions and review dates.

Last updated: October 10, 2026