Control Test Execution
Control Test Execution
Use Test Controller execution controls to start, monitor, and stop AIQ test runs. Confirm the execution plan, environment, data, and test-node capacity before starting a load or scenario execution.
Before starting
- Verify the target environment and test data are approved for the run.
- Confirm Test Nodes are online and sized for the planned load.
- Review ramp-up, duration, and stop conditions.
During execution
- Watch active users, throughput, errors, and output.
- Pause or stop the run if the target environment becomes unstable or the test is invalid.
- Capture the execution ID and relevant evidence for analysis.
Last updated: September 18, 2026