Skip to main content

Determine the Right Test Duration

One way of considering

Determine the differenceRight betweenTest functionalDuration

tests

Choose test duration based on the performance question being answered. A short smoke run can validate a script, while a longer run may be needed to observe steady-state behavior, resource growth, or reliability under sustained load.

Common duration patterns

  • Smoke validation: short run to confirm the scenario and performancedata testswork.
  • Baseline isrun: aenough functionaltime testto operatesreach asteady usestate caseand ascapture arepresentative singlemetrics.
  • Endurance virtualrun: userlonger once.execution Aused performanceto testobserve operatesstability and resource trends.

Before interpreting results

  1. Exclude ramp-up and ramp-down periods when analyzing steady-state performance.
  2. Confirm the userun casehad inenough multiplevalid concurrentlysamples running virtual users. As a functional test,for the Controllermetric windowbeing showsreviewed.
  3. Document environment, load model, data, and duration with the duration of each step measured in milliseconds. result.

After AIQ operates a test use the Analyze button from the Start Screen to view the test details. Choose the execution from the list. The Moving Average chart shows a moving average of transaction times through the duration of the test.

The Transaction Distribution chart shows the times to operate each transaction through the time of the test.


Last updated: JuneSeptember 26,18, 20232026

If you have any feedback on this topic, please contact us at documentation@appvance.ai