AIQ Install Preparation Checklist - Installation and Configuration
AIQ Install Preparation Checklist - Installation and Configuration
Use this checklist to prepare the installation plan, access, configuration, and validation steps for an AIQ deployment. This version should contain the procedural install-readiness items, while the System Requirements checklist remains focused on platform requirements.
Installation readiness checks
- Confirm installation owner, target environment, maintenance window, and rollback plan.
- Verify hostnames, ports, certificates, service accounts, database access, repositories, and SMTP/integration requirements.
- Prepare installers, licenses, configuration files, backup/snapshot plan, and support contacts.
- Confirm test accounts, sample scenarios, and smoke-test criteria for post-install validation.
- Document customer-specific proxy, firewall, SSO, repository, and monitoring requirements.
Validation workflow
- Complete pre-install checks and capture approvals.
- Install or upgrade AIQ using the approved procedure.
- Validate login, Controller health, Test Node connectivity, repository access, and a small execution.
- Record open issues and follow-up actions before handing the environment to users.
Duplicate-content note: This article overlaps with the System Requirements checklist; keep this one as the procedural install checklist and consolidate duplicate requirement-only items into the requirements page.
Last updated: October 15, 2026
Readiness outcome
Complete the checklist before installation begins and record any exception with an owner and remediation date. Keep platform requirements separate from procedural readiness so changes to hosts, certificates, credentials, or integrations can be reviewed without losing the deployment baseline.
AIQ Install Preparation Checklist - Installation and Configuration
Use this checklist to prepare the installation plan, access, configuration, and validation steps for an AIQ deployment. This version should contain the procedural install-readiness items, while the System Requirements checklist remains focused on platform requirements.
Installation readiness checks
- Confirm installation owner, target environment, maintenance window, and rollback plan.
- Verify hostnames, ports, certificates, service accounts, database access, repositories, and SMTP/integration requirements.
- Prepare installers, licenses, configuration files, backup/snapshot plan, and support contacts.
- Confirm test accounts, sample scenarios, and smoke-test criteria for post-install validation.
- Document customer-specific proxy, firewall, SSO, repository, and monitoring requirements.
Validation workflow
- Complete pre-install checks and capture approvals.
- Install or upgrade AIQ using the approved procedure.
- Validate login, Controller health, Test Node connectivity, repository access, and a small execution.
- Record open issues and follow-up actions before handing the environment to users.
Duplicate-content note: This article overlaps with the System Requirements checklist; keep this one as the procedural install checklist and consolidate duplicate requirement-only items into the requirements page.
Readiness outcome
Complete the checklist before installation begins and record any exception with an owner and remediation date. Keep platform requirements separate from procedural readiness so changes to hosts, certificates, credentials, or integrations can be reviewed without losing the deployment baseline.
Last updated: October 9, 2026